If you’re planning a kitchen or bathroom remodel in Dunwoody, the permit comes from the City of Dunwoody. Dunwoody has been a city since December 1, 2008, and its Community Development Department handles building permits, plan review and inspections. This guide covers when a remodel needs a permit, what goes into the application, how long review takes, and what happens at inspection, so you can build the permit into your schedule from the start.
When Does a Remodel Need a Permit in Dunwoody?
The city’s rule is broad. A permit is required to construct, enlarge, alter, repair, move or demolish a building, or to install, alter, repair, remove or replace any electrical, gas, mechanical or plumbing system regulated by the construction codes. The city lists painting, floor coverings and wallpaper as routine maintenance that doesn’t need a permit.
For kitchens and baths, that usually works out like this:
| Your project | Permit? |
|---|---|
| Painting, new flooring, wallpaper | No. The city calls this routine maintenance. |
| Moving or adding plumbing, such as relocating a sink or adding a shower | Yes. Plumbing is a regulated system. |
| New circuits, lighting or a gas line for a range | Yes. Electrical and gas are regulated systems. |
| Changing ductwork or a vent hood that ties into the mechanical system | Yes. Mechanical work is regulated. |
| Moving or removing walls | Yes. That alters the building, and a load-bearing wall is structural work. |
Not sure where your project falls? The city suggests discussing it with the Community Development Department, at 678-382-6821 or permits@dunwoodyga.gov.
How to Apply: CentralSquare
On August 4, 2025, Dunwoody moved its Community Development permits to CentralSquare, replacing the old iWorQ system. Applications are filed online through the CentralSquare portal, and the city says you need a Contractor Account to apply there. After uploading, the city asks applicants to email permits@dunwoodyga.gov so staff know the application and plans are in.
For single-family homes, the city’s list of required documents includes:
- A completed Construction Permit Application
- A Homeowner Declaration, if the homeowner is doing the work
- Drawings in a single PDF, no larger than 50 MB
- The general contractor’s license, business license and government-issued photo ID, if the contractor is submitting to Dunwoody for the first time
- An Authorized Permit Agent Form, if someone submits licenses on another person’s behalf
One limit to know: the city won’t issue a permit to an owner who is neither a licensed contractor nor the occupant of the home being altered.
Plumbers, Electricians and HVAC: Subcontractors on One Permit
A kitchen or bath remodel usually brings in several trades. In Dunwoody, subcontractors don’t pull separate component permits for the job. They are added to the main construction permit with the city’s Sub-Contractor Form, plus their state license (as applicable), business license and photo ID, once the construction permit has been issued. That covers plumbing, mechanical and HVAC, electrical and low-voltage work. Georgia law (O.C.G.A. 43-14) requires anyone contracting for plumbing, electrical, low-voltage, heating and air conditioning or utility work to be licensed by the State Construction Industry Licensing Board.
On our Dunwoody projects, we pull the permits, and that’s how we prefer to work.
Plan Review: Up to 10 Business Days, According to the City of Dunwoody
The City of Dunwoody says all single-family residential projects require plan review, and that review may take up to 10 business days. The city emails or calls when review is finished. Once plans are approved, fees can be paid online by Visa or MasterCard, or by check or cash at City Hall, 4800 Ashford Dunwoody Road. The city then issues the permit and the approved plans. Fees are listed in the city’s Permit Fee Schedule.
Plan that review time into your schedule before demolition day. Our step-by-step kitchen remodel guide shows where permits fit.
Smoke and Carbon Monoxide Alarms: A Rule That Surprises Homeowners
Dunwoody’s single-family permit page lists a requirement that applies to interior remodels. When alterations, repairs or additions that require a permit are done, or when a bedroom is added or created, the home needs:
- A smoke/carbon monoxide alarm outside the sleeping rooms
- A smoke alarm in each bedroom
- At least one smoke alarm on every floor, including an unfinished basement
The alarms must be 120-volt powered with battery backup, and they must communicate with each other, hard-wired or wirelessly. The city lists two exceptions: exterior work (such as roofing, siding, windows, doors, porches or decks) and work limited to installing, altering or repairing plumbing or mechanical systems. So a kitchen remodel with new electrical work will likely trigger the alarm requirement, and it is worth budgeting for.
Inspections and the Certificate of Completion
Inspections are requested through the city’s portal by permit number, for a future date. The city doesn’t accept same-day inspection requests. Its inspectors work as combination inspectors, so the city says set inspection times are hard to schedule.
When the job passes final inspection, the city issues a Certificate of Completion or a Certificate of Occupancy, depending on the scope. The city notes it may be in a homeowner’s best interest to ask the contractor for that document before making the final payment.
One more tip from the city: watch for fraudulent emails posing as city staff. The city says it never uses wire transfers for planning-related applications.
Dunwoody Homes and the Permits They Tend to Need
Dunwoody stayed mostly rural until suburban subdivisions arrived in the 1960s, so many kitchens and baths here date from the 1960s and 1970s. In Dunwoody North, which Tom Cousins developed in 1963-64, early homes often have a wall between the kitchen and the family room. Opening it alters the building, and if the wall is load-bearing, it is structural work for the drawings. Split-levels bring their own questions about stairs and walls. Our guide to split-level layouts covers them, and our guide to taking out a structural wall covers beams and costs.
How We Plan a Permitted Remodel
Our showroom is at 4353 Tilly Mill Road, close to Dunwoody. Our process starts with an initial consultation at your home, where we take measurements. At the design review appointment at our showroom, we review your detailed design with 3D color renderings and an itemized proposal. Once the design and proposal are final, our designer and master craftsman conduct a final design review and final measure at your home.
See our Dunwoody kitchen remodeling page and Dunwoody bathroom remodeling page for the work we do there. Next door, see the bathrooms we remodel in Chamblee and our kitchen and bath work in Doraville. Kitchen Design Studio & Remodeling of Atlanta is licensed in Georgia (RBC0006934) and backs its work with a one-year contractor warranty.
Dunwoody Permit FAQ
Do I need a permit to remodel my kitchen in Dunwoody?
Usually, yes. The City of Dunwoody requires a permit to alter a building or to install, alter or replace regulated electrical, gas, mechanical or plumbing systems. Painting, floor coverings and wallpaper are routine maintenance and don’t need one.
Do I need a permit for a bathroom remodel in Dunwoody?
If the work touches plumbing, electrical or mechanical systems, or changes walls, yes. New floor coverings and paint alone are routine maintenance.
Where do I apply for a Dunwoody building permit?
Online through the city’s CentralSquare permitting portal, which replaced iWorQ on August 4, 2025. You need a Contractor Account to apply, and the city asks you to email permits@dunwoodyga.gov after uploading.
How long does a Dunwoody building permit take?
According to the City of Dunwoody, plan review for single-family residential projects may take up to 10 business days. After approval, you pay the fees and the city issues the permit.
Do my plumber and electrician need their own permits?
No separate component permit. In Dunwoody, subcontractors are added to the main construction permit with the Sub-Contractor Form after it is issued, along with their licenses and ID.
Plan Your Dunwoody Remodel